SKATERRA
SKATERRA
  • Home
  • Services
  • Projects
  • More
    • Home
    • Services
    • Projects
  • Home
  • Services
  • Projects

Projects

Lyme Adirondack Forest Company

  VARIOUS SITES, SOUTHERN ADIRONDACKS

APRIL 15 – OCTOBER 15, 2020

Scope:

21.7 Miles Road Reconstruction and Resurfacing

Ditching, Drainage, Grading

96 LF Corrugated Steel Pipe Arch Installed

2,342 LF Polyethylene Culvert Installed

3500 CY Gravel crushed on-site

2050 Ton Crushed Stone Import

Mass Quantity In situ Bank Run Material Utilization

Bridge Re-decking  over NYSDEC Wild and Scenic Kunjamuk River

Bank Stabilization, Jessup River

Burnt - Rossman Hills State Forest

  NYS DEPARTMENT OF ENVIRONMENTAL CONSERVATION

SUMMIT, NY

AUGUST 6-27, 2018

Scope: 

17,570 LF Road Rehabilitation and Resurfacing

7,960 LF Non-Woven Geotextile Stabilization Fabric

5,605 Tons limestone Crusher Run Import

808 CY Shale Subbase Cut/Fill/ Grade

445 LF Polyethylene Culvert Installation

Fabrication and Installation of Traffic Barriers


NYS Boat Launch Decontamination Stations

BROADALBIN, NORTHVILLE, LAKE LUZERNE 

PAUL SMITHS COLLEGE, ADIRONDACK WATERSHED INSTITUTE

JULY 2017

Scope:

Design and construction of boat decontamination stations at three NYSDEC boat launches working around existing infrastructure to efficiently streamline traffic patterns and responsibly contain and divert water from watercraft invasive species decontamination.

    Copyright © 2024 Skaterra - All Rights Reserved.


    Powered by GoDaddy