VARIOUS SITES, SOUTHERN ADIRONDACKS
APRIL 15 – OCTOBER 15, 2020
Scope:
21.7 Miles Road Reconstruction and Resurfacing
Ditching, Drainage, Grading
96 LF Corrugated Steel Pipe Arch Installed
2,342 LF Polyethylene Culvert Installed
3500 CY Gravel crushed on-site
2050 Ton Crushed Stone Import
Mass Quantity In situ Bank Run Material Utilization
Bridge Re-decking over NYSDEC Wild and Scenic Kunjamuk River
Bank Stabilization, Jessup River
NYS DEPARTMENT OF ENVIRONMENTAL CONSERVATION
SUMMIT, NY
AUGUST 6-27, 2018
Scope:
17,570 LF Road Rehabilitation and Resurfacing
7,960 LF Non-Woven Geotextile Stabilization Fabric
5,605 Tons limestone Crusher Run Import
808 CY Shale Subbase Cut/Fill/ Grade
445 LF Polyethylene Culvert Installation
Fabrication and Installation of Traffic Barriers
BROADALBIN, NORTHVILLE, LAKE LUZERNE
PAUL SMITHS COLLEGE, ADIRONDACK WATERSHED INSTITUTE
JULY 2017
Scope:
Design and construction of boat decontamination stations at three NYSDEC boat launches working around existing infrastructure to efficiently streamline traffic patterns and responsibly contain and divert water from watercraft invasive species decontamination.